top of page
BINDABASINI PRIMARY SCHOOL - 2ND BUILDING
COMPLETED IN FEBRUARY 2020
Nayagaun, Kavrepalanchok, Nepal
Bindabasini school was damaged during the earthquakes in 2015 when most of the stone spilt out of the walls. The school community saved the teaching spaces by temporarily covering the walls with corrugated iron.
In 2019-2020, two of these temporary structures were demolished and replaced with rammed earth buildings. Stone from demolitions was reused and steel trusses altered and reinstalled in the new buildings.
Funding: Namaste Nepal, Rotary Club
bottom of page